General Highlights:
- Hardwood floors throughout the entire house
- Custom woodwork throughout the entire house
- Chair rail and wall frames in first and second-floor common areas
- Custom crown molding in first and second-floor common areas (around the ceiling and door headers)
- Dining room: frame and panel columns, chair rail, coffered ceiling
- Downstairs bedroom: custom hand-made built-in desk and shelving with hand-turned solid walnut knobs and lighting for a workspace
- Passive radon abatement system (only a few homes in the neighborhood have this)
- Upstairs:
- Stair treads planed, sanded and refinished
- Crown molding in hallway, loft, and bedroom
- Custom frame and panel library with 3 window seats for seating and storage
- Window seats include recessed cast brass seat pulls
- Nest thermostat
- Hot water heater replaced (2014-2015 range)
- 200-amp electrical service with 2 subpanels (1 for workshop and 1 for solar panels/EV charger)
- Solar panels (2017)
- Fenced-in raised-bed vegetable gardens
- 800-series Bosch dishwasher (2014) (this is a high-end dishwasher that currently retails in the $1100-$1300 price range)
- All smoke/carbon monoxide detectors replaced (2015)
- Wooden steps on back lanai rebuilt and replaced (2018)
- Landscaped with low-maintenance perennial plants (most are native plants)
- Saltbox solid cedar shed built by hand for garden tools and supplies (new steps, planter box, and paint 2020)
- Basement improvements:
- ½ is finished
- Includes space that is framed for a ½ bath
- Recessed lights
- Pipes rerouted to enable a drywall ceiling instead of a drop ceiling
- Plumbed and prepped for a flueless fireplace
- Hardwired for cable and internet connection
- ½ is a workshop with electrical service for its own 100-amp sub-panel
- Separate utility room for storage
- Furnace and hot water heater enclosed in a separate room with custom hand-made pine door with black strap hinges
- ½ is finished
- Garage:
- Storage/shelving above the garage bays
- Four LED shop lights to brighten the garage for a workspace
- Garage door springs replaced (2019)
- Wiring for level 2 charger for EV car in the first bay of garage (2017)
- Epoxy floor professionally installed (2015)
- Improved rollers and belt-driven garage door system for smoother and quieter operation (2018)